UPVC pipe installation needs to be glued with UPVC glue. installation instructions and notes are as follows

1. The pipe end shall be cut flat and perpendicular to the pipe axis, and the fixed pipe box and handsaw or pipe cutter can be used.

UPVC pipe cutting

2. Remove the broken particles inside and outside the PVC Pipe, and chamfer (10-15 degrees) Upvc Pipe Clean

3. Wipe off the dust, oil stain and moisture at the place where the pvc pipe and pvc pipe fittings need to be coated with glue. Moisture, dust, and oil can affect bond strength.

UPVC pipe clean 2


4. Measure the socket depth of pipe fittings, and mark the depth dimension on the pipe.UPVC pipe fitting socket dimension check

5. Start bonding

First, apply a thin layer of pre adhesive on the Outer surface of the upvc pipe and the inner face of the UPVC Pipe Fitting then apply a thin layer of UPVC glue on the Outer surface of the upvc pipe and the inner face of the UPVC pipe fitting, then apply a layer of UPVC glue on the Outer surface of the upvc pipe and the inner face of the UPVC pipe fitting, then push the pipe into the pipe fitting quickly before the glue dry.

UPVC pipe fitting glueUPVC pipe glue

Note that the glue should be evenly applied, not too much, not too little, too little will make the bonding not strong, too much will make the glue flow into the pipe fitting and cause blockage. When inserting the pipe, first insert the pipe horizontally at the depth of 2 / 3 of the socket depth, then slowly push the pipe into the bottom of the pipe while rotating the pipe.

UPVC pipe fitting pressUPVC pipe fitting gluing clean

Compress the bonded pipe for 3 minutes to prevent the pipe from being pushed out, wipe off the excess glue at the outer face, and then place the bonded pipe statically until the glue solidifies before moving. The adhesive pipe must wait for the glue to dry before it can take hydraulic test..


Technical data sheet

1. glue solidifies time table

Temperature

(℃)

Pipe Size

12-32mm

38-50mm

64-200mm

250-300mm

>300mm

15~38

2min

3min

30min

2h

4h

4~15

5min

8min

2h

8h

16h

-17~4

10min

15min

12h

24h

48h


2. glue dry time table

Temperature

(℃)/relative humidity<60%

Pipe Size

12-32mm

38-50mm

64-200mm

250-300mm

>300mm

15~38

15min

25min

1.5h

48h

72h

4~15

20min

30min

4h

6h

6days

-17~4

30min

45min

72h

8days

14days

Share to:

LET'S GET IN TOUCH

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send